fix bar
fix bar
fix bar
fix bar
fix bar
fix bar

Jalan

Jalan

No Ruas Kota/Kab. Stat. P(Km) L(m) Kondisi(Km)
Aspal Japat Tanah Beton
115 0.143. - POTOWAIBURU - KAPIRAYA (URUMUGA) MIMIKA Prov 35 4.5 0 4.5 0 0
0 0 0 0
0 0 0 0
116 122.. - MENAWI - SUMBERBABA YAPEN WAROPEN Prov 40 9 0 0 0 0
2.8 0 0 0
17.4 0 0 0
117 0.139. - ENAROTALI (PANIAI) - SUGAPA PANIAI Prov 50 4.5 0 0 0 0
0 0 0 0
0 0 0 0
118 0.136. - DUBER - SORENDIWERI - KORIDO SUPIORI Prov 30 4.5 17.17 0 0 0
10.08 0 0 0
2.75 0 0 0
119 0.135. - DOUBO - SORENDIWERI - AMYAS SUPIORI Prov 30 6 22.75 0 0 0
12.06 0 0 0
12.44 6.06 0 0
120 0.134. - WARDO - DUBER BIAK NUMFOR Prov 37.96 5 20 0 0 0
13.4 0 0 0
3.5 0 0 0